Client
VISY K5 Batch Plant
Project type
Industrial Manufacturing Infrastructure
Location
Yatala, Queensland
Size
2,152 sqm and stands 39 metres high
Completion date
2024 – 2026
Client / Developer
Visy Glass Operations (Australia) Pty Ltd


Scope of Works Delivered
JKR Group was engaged by Build Run Repair (BRR) to deliver the structural steel erection and mechanical installation for the new K5 Batch Plant at Visy’s Yatala Glass Manufacturing Facility. This facility forms a critical component of Visy’s raw materials and recycled glass handling operations, supporting high-volume, continuous glass production.
Key works included:
Structural steel erection for the multi-level Batch Plant structure rising over 22 metres
Installation of the Beneficiated Cullet Transfer Tower
Erection of the Raw Materials Warehouse steel structure
Installation of the Belt Bridge and Main Gantry
Assembly and installation of platforms, stairs, and walkways
Mechanical installation of silos, hoppers, and bulk material handling equipment
Installation and alignment of bucket elevators, conveyors, mixers, and feeders
Integration of mechanical systems within the structural framework